Utopia Village

2018-10-18T08:47:21+00:00

Commercial Refurbishment
Utopia Village

 

Utopia village is a collection of 28 separate commercial units of varying size and layout. These units are situated within a combination of Victorian and 1960’s buildings with a range of tenants from standard offices to specialised sound recording studios.

The offices had been neglected for a number of years […]

Educational: University of the Arts, London

2017-05-19T14:58:33+00:00

Educational
University of the Arts, London

Sites: 272 High Holborn. Brooke Hall, Camberwell, John Princes St,
Elephant and Castle, Lime Grove and Richbell Place

Client: University of the Arts

Examples of works:

  • Refurbishments
  • Emergency CCTV drain investigations
  • Expansive roof works and leak repairs
  • Secure removal of asbestos
  • Heating system investigations
  • Painting and decorating

Educational: Opal 1 student accommodation

2017-05-19T15:03:32+00:00

Educational
Opal 1 student accommodation

On-going maintenance work, Opal Group, Opal 1 student
accommodation, Will Wyatt Court, London NW1

Client: Opal Group, Frathouse

Works description:

  • Kitchen installations
  • Painting and decorating
  • HWS and boiler works Extensive carpeting Electrical reactive services Toilet/shower refurbishments

Commercial Refurbishment: 1-5 London Wall, London

2018-10-18T08:47:21+00:00

Commercial Refurbishment
1-5 London Wall, London

Work included lobby, stair and corridor refurbishments, high spec toilet installations, bespoke carpentry, high level decorating and leather panel cladding. These offices were in constant use during the works period, requiring extensive cleaning after each working period, which took place 6pm-6am. Works were finished on time and on budget […]

Commercial Refurbishment: 64-65 London Wall, London, EC2

2018-10-18T08:47:21+00:00

Commercial Refurbishment
64-65 London Wall, London, EC2

Works carried out as principal contractor for City of London Corporation at 64-65 London Wall. Listed buildings works included: Complete refurbishment of toilets, communal areas, stairways and kitchenettes across two floors of offices. This included demolition, first and second fix electrics and plumbing, installation of sanitary ware and […]

Go to Top